Project Overview

Rowan Metal Works fabricated the complete structural steel package for a 28,000 SF commercial warehouse in Concord, NC. The project involved wide-flange columns and beams, HSS bracing, base plates, and all connection hardware. The steel package was delivered sequenced to support the erection contractor's schedule.

The project was completed under a subcontract to the general contractor, working from engineer-stamped structural drawings. Full mill certifications and weld documentation were provided at project closeout.

Challenges & Solutions

ChallengeAccelerated Schedule

We prioritized material procurement at contract award and maintained a rolling 2-week fabrication lookahead to ensure delivery stayed ahead of erection.

ChallengeConnection Coordination

Coordinated directly with the structural engineer of record to resolve connection details before fabrication, eliminating field fit-up issues.

ChallengeCoating Specification

Applied a two-coat epoxy primer system to SSPC SP 10 blast profile, meeting the owner's corrosion protection specification for the warehouse environment.

Gallery

Steel frame columns and beams during erection at commercial warehouse construction site
Welder performing structural weld on beam connection in fabrication shop with bright sparks
Fabricated steel columns lined up in shop yard awaiting delivery to construction site
Completed steel frame structure showing full bay framing with bracing and connection plates

Project Specs

Total Steel Weight±82 Tons
Building Footprint28,000 SF
Steel GradeASTM A992 / A36
Coating System2-Coat Epoxy Primer
Blast StandardSSPC SP 10
Welding StandardAWS D1.1
Production Duration6 Weeks
Client IndustryCommercial Construction